Hello everybody,
This week, my objectives were:
1. Get the pump running for my system.
2. Finish building the non-electronic part of the system.
This week, I finally got the pump to work. I connected the system, and it worked great. However, the top pipe overflowed within fifteen seconds.
Although, I did manage to make the bottom pipe like the top one, so the system is finished except for making sure the system works water-wise and then I will plant some plants in it.
Thanks for reading,
Ben
No comments:
Post a Comment